Power Grid Corporation of India Limited (POWERGRID), a Maharatna CPSU, celebrated the auspicious Bhoomi Pujan for its upcoming green hyperscale data center facility at Manesar, Gurugram. Labotek Technologies participated in the ceremony as a key engineering and infrastructure contractor.
Leveraging National Grid Connectivity
The Manesar data center is uniquely positioned to draw high-reliability, renewable-heavy electricity directly from the interstate transmission network, bypassing congested municipal distribution loops. Labotek is executing the high-voltage substation interconnects and resilient power conditioning infrastructure.
Key Facility Specifications
- Direct Grid-Tied Redundancy: Dedicated dual 66kV transmission feeders ensuring continuous Tier-IV concurrent maintainability.
- Integrated Renewable Energy Management: Dynamic inverter synchronization with round-the-clock green power purchase agreements.
- Rapid Deployment Architecture: Modular prefabricated power skids reducing jobsite construction timelines by over 35%.
- Intelligent Thermal Containment: Cold-aisle containment coupled with magnetic-bearing chillers to achieve an operational design PUE under 1.25.
This initiative represents another major milestone in India's journey toward clean, energy-efficient digital sovereign computing.